Facility management, and the four things federal policy says it has to be

Published , updated

Facility management is running a building, or a small estate of them, as a service to the people in it: the plant and the systems kept working, the space cleaned and heated, the grounds and the fabric maintained, the statutory tests done, and somebody accountable for all of it. The United States actually writes the definition down for its own buildings. 41 CFR 102-74.10 requires agencies to manage, operate and maintain their buildings so as to provide quality space and services consistent with operational needs, and puts four conditions on how: cost effective and energy efficient, adequate to meet the mission, meeting nationally recognized standards, and at a level that maintains and preserves the physical plant assets consistent with available funding. That last clause is the whole job in one sentence, and this page works outwards from it.

Facility management meaning, in the one place it is defined

Most definitions of the term are a list of activities. The federal one is a duty with conditions, and it is more useful because it says what a facility manager is answerable for rather than what they do all day: quality space and services, at a cost that stands up, to a recognized standard, at a level that preserves the assets within the money available. Read it as a test rather than a mission statement. If the plant is preserved but the budget is blown, or the budget holds while the roof degrades, the duty is not being met either way.

What facility management covers, as a list somebody has to own

The same regulation enumerates the services for federal buildings: custodial, solid waste management including recycling, heating and cooling, landscaping and grounds maintenance, tenant alterations, minor repairs, building maintenance, integrated pest management, signage, parking, and snow removal. A private site's list is the same shape with different names on the contracts. What matters is that each line has an owner, a frequency and a record, because the lines nobody owns are the ones discovered by an inspector or a flood.

Facility management examples, from a school district to church facility management

A school district: statutory tests, heating, grounds, and a summer window when work can happen at all. A hospital: the same plant with redundancy requirements and no window at all. A manufacturing plant: the building is secondary to the line, and facility work is scheduled around production. A church campus: volunteers, an old fabric and a tiny budget, where the schedule has to be short enough to be kept. A corporate office: the fabric is somebody else's under a lease, and the job is services and space. Same duty, four different schedules, and the difference is the constraint rather than the asset list.

Facility management, asset management, and the one register under both

Facility management asset management is the awkward phrase for a real overlap. A facility register answers what a thing needs and when; a fixed asset register answers what it is worth and how it depreciates. They usually list the same boiler. They are different documents because the question differs, and a site that tries to run maintenance off the finance register ends up with a list of values and no intervals. Keep one register with the condition, the interval and the history, and let finance take a feed from it.

Where facility management stops and the maintenance record starts

The O*NET description of a facilities manager is to plan, direct or coordinate the operations and functionalities of facilities and buildings, which is management. Under it sits the work: the asset register, the preventive schedule against each asset, the work order raised when something needs doing, and the history the work orders accumulate into. That lower layer is what a computerised maintenance management system holds and what this site is built for. The division is worth naming because the two are bought separately and often confused: a management product reports, a maintenance record is what it reports on, and a report over no record is an opinion.

A facility management plan, and the four things on it

The asset list with a condition against each. The tasks and intervals, with where each interval came from. The load, in hours, set against the people and contractors actually available. And a review date with a statement of what will be reviewed, which is the line that turns a plan into a program. A plan that has the first two and not the second two is a wish list, and it is the most common shape of facility management plan in circulation.

Questions people ask about facility management

Is facility management the same as facilities management?

In practice yes, and the plural is more common in the United Kingdom. Where anybody draws a distinction it is that facility management is one building and facilities management is an estate, which is a difference of scale rather than of duty.

Does facility management include maintenance?

Yes, as one of its services, and it is the service with the longest tail. The federal list puts building maintenance and minor repairs alongside custodial, heating and grounds.

Who does facility management report to?

Operations, property or finance, depending on whether the building is seen as a cost, an asset or a risk. The reporting line usually decides which of the four federal conditions gets attention.

What is the smallest site that needs a facility manager?

Not a headcount question. The trigger is when somebody other than the person doing the work needs to know what is due, which is the same trigger as needing a maintenance record rather than a spreadsheet.

How is church facilities management different, and what does church maintenance cost a volunteer team?

A church campus has an old fabric, a statutory tail as long as any office block, almost no budget and a workforce of volunteers available at fixed times. The schedule that survives there is short, seasonal and written so that somebody who is not a technician can do the checks and hand the findings on. The cost sits almost entirely in the plant and the envelope, and the record matters more than usual because the people change.

What do people mean by facility software management, or by facility management system software?

The same category, written in a different word order. Both phrases are searched by people looking for the product that holds a building's asset register, the schedule against it and the work orders that come off it, and the word order tells you nothing about what the product does. Judge any of them on those three things and on whether last year's history is still readable.

Sources

Related answers

Price your reactive work against plannedSee what your PM schedule costs to run